HKY Technology Co.,Ltd. signed the supply contract with the project’s EPC contractor, The Consortium of Guangdong Electric Power Design Institute and Guangdong Power Engineering Corporation of China Energy Engineering Group Co.,Ltd. and agreed to supply lab package of the chemical laboratory and environment laboratory. We will supply all the lab use glass ware, furniture, instruments. HKY arranged two engineers at site to do the installation, commission and training for the users.
Our bentchtop sodium, pH and conductivity meters
Our bentchtop silica, phosphate, hydrazine and turbidity meters
VINH TAN 1 BOT COAL-FIRED POWER PLANT PROJECT is one of the important projects of Belt and Road Policy, which has a total capacity of 1,200MW and a total capital investment up to 2 billion us dollars in the form of BOT (build-operate-transfer).
Our products are the best quality and we the experienced lab package supplier in the field of the power plant for more than 20 years. We are confidence to do the best for our cooperator and will transfer good products which Made in China to the world.